Call us on 0191 487 3036 or email info@first4playgrounds.co.uk

first4playgrounds Trim Trails in Hartlepool at Eldon Grove Academy

by | Jan 9, 2017 | News, North East & Yorkshire

Trim Trails

first4playgrounds construction team just installed a range of Trim Trails for Eldon Grove Academy in Hartlepool. A trim trail is a range of different equipment that makes up an obstacle course for the children.

trim-trail-hartlepool-4

Ascending Balance Beam at Eldon Grove Academy in Hartlepool

The playground tarmac is cut, then the holes are dug to the depth that suits each piece of timber.

trim-trail-hartlepool-2

Burma Bridge at Eldon Grove Academy in Hartlepool

Once apparatus is then fabricated it is placed into the holes.

trim-trail-hartlepool-1

Overground tunnel at Eldon Grove Academy in Hartlepool

After this additional pieces are added e.g. ropes etc

trim-trail-hartlepool-5

Black Wetpour on tarmac at Eldon Grove Academy in Hartlepool

We add two layers of wetpour. Using wetpour playground surfacing reduces the chance of injuries in the playground.

Useing EPDM rubber crumbs combined with a polyurethane binder creates a bonded wetpour rubber surface. This formula is installed directly into playgrounds. Mixing, pouring, levelling, screeding and rolling, allows to install the surfacing in a variety of depths.

Recent Posts…

For more information call us on 0191 487 3036 or email info@first4playgrounds.com